Hyland Consultants has been appointed by Italian bridging specialist DEAL to manage and undertake Design Verification and Commissioning Inspection services for its bridge launching equipment for the Westconnex M4 Motorway Project.
WestConnex is Australia’s biggest urban road project and will be delivered in three stages over 10 years. It includes 69 spans of overhead bridging using up to 50 metre long, 2 metre deep, 100 tonne prestressed concrete T-beams.
The Rizzani De Eccher Leighton joint venture was selected to design and construct the 7.5 kilometre upgrade.
Hyland Consultants engaged W.A. Corkery & Associates, SGS (New Zealand) and SGS (Australia) to form the project team.